Login
 
Quick Links
 
Aggregates Gradation Averages
Area from Cubic Yard

How Many Square Feet from 1 Cubic Yard?
Thickness
[Inch]
Area
[Square Feet]
 Thickness
[Inch]
Area
[Square Feet]
1" 324 7"46
1-1/4" 259 7-1/4"44
1-1/2" 216 7-1/2"43
1-3/4" 185 7-3/4"42
2" 162 8"40
2-1/4" 144 8-1/4"39
2-1/2" 130 8-1/2"38
2-3/4" 118 8-3/4"37
3" 108 9"36
3-1/4" 100 9-1/4"35
3-1/2" 93 9-1/2"34
3-3/4" 86 9-3/4"33
4" 81 10"32
4-1/4" 76 10-1/4"31
4-1/2" 72 10-1/2"31
4-3/4" 68 10-3/4"30
5" 65 11"29-1/2
5-1/4" 62 11-1/4"29
5-1/2" 59 11-1/2"28
5-3/4" 56 11-3/4"27-1/2
6" 54 12"27
6-1/4" 52 12-1/4"26-1/2
6-1/2" 50 12-1/2"26
6-3/4" 48 12-3/4"25-1/2

TOP
Asphalt Quantity Calculator
Asphalt Hot Mix Estimating Table

Asphalt Hot Mix Estimating Table
Ton Inch Square Feet Square Yards
1 ton 0.5 inch by316.0035.11
1 ton 1.0 inch by158.0017.56
1 ton 1.5 inches by105.3311.70
1 ton 2.0 inches by79.008.78
1 ton 3.0 inches by52.675.85
1 ton 4.0 inches by39.504.39
1 ton 5.0 inches by31.603.51
1 ton 6.0 inches by26.332.93
1 ton 7.0 inches by22.572.51
1 ton 8.0 inches by19.752.19
1 ton 9.0 inches by17.561.95
1 ton 10.0 inches by15.801.75
Formula: Compacted Inplace Measurements:
Square Feet X Depth     = Cubic Feet
Cubic Feet / 27              = Cubic Yards
Cubic Yards X 4.101 lbs = Total Lbs
Total Lbs / 2000             = Total Tons
       1 Cubic Foot = 151.9 Lbs
       1 Cubic Yard = 4.101 Lbs
       1 Cubic Yard = 2.05 Tons
       1 Ton       = 13.17 Cubic Feet
       1 Sq Ft Inch  = 12.66 Lbs
       1 Sq Yd Inch = 113.93 Lbs

TOP

Cement/ Lime/ Sand
Portland Cement
A bag of Portland Cement weighs 94 lbs.
A bag of Portland Cement contains 1.0 cubic foot.
A cubic foot of Portland cement weighs 94 lbs.
A 12 quart bucket holds 38 lbs of Portland Cement.
A 12 quart bucket holds 0.4 cu ft of Portland Cement.
 
Hydrated Lime
Hydrated Lime weights 40 lbs per cubic foot.
 
Sand
A cubic yard of sand weighs 2,400 lbs.
A ton of sand is approx. 4/5 of a cubic yard.
A cubic foot of sand weighs approx. 90 lbs.
A 12 quart bucket holds approx. 40 lbs of sand.
A ton of sand contains approx. 22 cubic feet of sand.
 

TOP
Concrete Sand Estimating Table

Concrete Sand Estimating Table
Ton Inch Square Feet Square Yards
1 ton 1.0 inch by249.2327.69
1 ton 2.0 inches by124.6213.85
1 ton 3.0 inches by83.089.23
1 ton 4.0 inches by62.316.92
1 ton 5.0 inches by49.855.54
1 ton 6.0 inches by41.544.62
1 ton 7.0 inches by35.603.96
1 ton 8.0 inches by31.153.46
1 ton 9.0 inches by27.693.08
1 ton 10.0 inches by24.922.77
Formula: Compacted Inplace Measurements:
Square Feet X Depth = Cubic Feet
Cubic Feet / 27 = Cubic Yards
Cubic Yards X 2,600 lbs = Total Lbs
Total Lbs / 2000 = Total Tons
1 Cubic Foot = 96.296 Lbs
1 Cubic Yard = 2,600 Lbs
1 Cubic Yard = 1.30 Tons
1 Ton = 20.77 Cubic Feet
1 Sq Ft Inch = 8.02 Lbs
1 Sq Yd Inch = 72.22 Lbs

TOP

Concrete Volume Calculator
Cone, Cube, Cylinder, Prism Volume
Cylinder Volume Conversion Chart

Cylinder Volume Conversion
DiameterInches per Lineal Inch Cubic Feet per Lineal Foot
628.270.196
850.270.349
1078.600.550
12113.100.785
16201.071.400
18254.471.767
22314.001.800
24454.393.142
30706.864.910
361,017.887.070


TOP


D-1 Base Course Estimating Table

D-1 Base Course Estimating Table
Ton Inch Square Feet Square Yards
1 ton 1.0 inch by170.6818.95
1 ton 2.0 inches by85.299.48
1 ton 3.0 inches by56.866.23
1 ton 4.0 inches by42.644.74
1 ton 5.0 inches by34.123.79
1 ton 6.0 inches by28.433.16
1 ton 7.0 inches by24.372.71
1 ton 8.0 inches by21.322.37
1 ton 9.0 inches by18.952.11
1 ton 10.0 inches by17.061.90
Formula: Compacted Inplace Measurements:
Square Feet X Depth = Cubic Feet
Cubic Feet / 27 = Cubic Yards
Cubic Yards X 3,799 Lbs = Total Lbs
Total Lbs / 2000 = Total Tons
1 Cubic Foot = 140.7 Lbs
1 Cubic Yard = 3,799 Lbs
1 Cubic Yard = 1.90 Tons
1 Ton = 14.21 Cubic Feet
1 Sq Ft Inch = 11.73 Lbs
1 Sq Yd Inch = 105.53 Lbs

TOP

Grout Calculations for Concrete Blocks
Length - Area - Volume Conversion Chart
Mass Conversion Table



Conversion Table for Mass

 
Approximate Conversions To Metric Measures Approximate Conversions From Metric Measures
When you Know Multiply by To Find When You Know Multiply by To Find
ounces 28.3 grams grams 0.035 ounces
pounds 0.45 kilograms kilograms 2.2 pounds
short tons 0.91 metric ton metric ton 1.1 short tons

TOP



Pit Run Type II Estimating Table

Pit Run Type II Estimating Table
Ton Inch Square Feet Square Yards
1 ton 1.0 inch by161.0717.90
1 ton 2.0 inches by80.548.95
1 ton 3.0 inches by53.695.97
1 ton 4.0 inches by40.274.47
1 ton 5.0 inches by32.213.58
1 ton 6.0 inches by26.852.98
1 ton 7.0 inches by23.012.56
1 ton 8.0 inches by20.132.24
1 ton 9.0 inches by17.901.99
1 ton 10.0 inches by16.111.79
1 ton 11.0 inches by14.641.63
1 ton 12.0 inches by13.421.49
Formula: Compacted Inplace Measurements:
Square Feet X Depth = Cubic Feet
Cubic Feet / 27 = Cubic Yards
Cubic Yards X 4,023 Lbs = Total Lbs
Total Lbs / 2000 = Total Tons
1 Cubic Foot = 149 Lbs
1 Cubic Yard = 4,023 Lbs
1 Cubic Yard = 2.01 Tons
1 Ton = 13.42 Cubic Feet
1 Sq Ft Inch = 12.42 Lbs
1 Sq Yd Inch = 111.75 Lbs

TOP

Sealant Coverage Chart

Joint Size Depth x Width (Inches) Lineal Feet per US Gallon Joint Size Depth x Width (Millimeters) Meters per Liter
1/8 x 1/8 1232.0 3.2 x 3.2 99.20
1/8 x 1/4 616.0 3.2 x 6.4 49.60
1/8 x 3/8 410.7 3.2 x 9.5 33.07
1/8 x 1/2 308.0 3.2 x 12.7 24.80
1/8 x 5/8 246.4 3.2 x 15.9 19.84
1/8 x 3/4 205.3 3.2 x 19.1 16.53
1/8 x 7/8 176.0 3.2 x 22.2 14.17
1/8 x 1 154.0 3.2 x 25.4 12.40
1/4 x 1/4 308.0 6.4 x 6.4 24.80
1/4 x 3/8 205.0 6.4 x 9.5 16.53
1/4 x 1/2 154.0 6.4 x 12.7 12.40
1/4 x 5/8 123.2 6.4 x 15.9 9.92
1/4 x 3/4 102.7 6.4 x 19.1 8.27
1/4 x 7/8 88.0 6.4 x 22.2 7.09
1/4 x 1 77.0 6.4 x 25.4 6.20
3/8 x 3/8 136.9 9.5 x 9.5 11.02
3/8 x 1/2 102.7 9.5 x 12.7 8.27
3/8 x 5/8 82.1 9.5 x 15.9 6.61
3/8 x 3/4 68.4 9.5 x 19.1 5.51
3/8 x 7/8 58.7 9.5 x 22.2 4.72
3/8 x 1 51.3 9.5 x 25.4 4.13
1/2 x 1/2 77.0 12.7 x 12.7 6.20
1/2 x 5/8 61.6 12.7 x 15.9 4.96
1/2 x 3/4 51.3 12.7 x 19.1 4.13
1/2 x 7/8 44.0 12.7 x 22.2 3.54
1/2 x 1 38.5 12.7 x 25.4 3.10
5/8 x 5/8 49.3 15.9 x 15.9 3.97
5/8 x 3/4 41.1 15.9 x 19.1 3.31
5/8 x 7/8 35.2 15.9 x 22.2 2.83
5/8 x 1 30.8 15.9 x 25.4 2.48
3/4 x 3/4 34.2 19.1 x 19.1 2.76
3/4 x 7/8 29.3 19.1 x 22.2 2.36
3/4 x 1 25.7 19.1 x 25.4 2.07
7/8 x 7/8 25.1 22.2 x 22.2 2.02
7/8 x 1 22.0 22.2 x 25.4 1.77
1 x 1 19.3 25.4 x 25.4 1.55

TOP

Sonotube (Cubic Yards)

Conversion Chart Length Feet / Inches Diameter

 


Length In Feet Diameter in Inches
6 8 10 12 14 16 18 20 24 30 36 48
1 0.007 0.013 0.02 0.029 0.039 0.051 0.065 0.08 0.116 0.181 0.261 0.465
2 0.02 0.03 0.04 0.06 0.08 0.1 0.14 0.16 0.24 0.36 0.52 0.93
3 0.02 0.04 0.06 0.09 0.12 0.15 0.21 0.24 0.36 0.54 0.78 1.4
4 0.03 0.05 0.08 0.12 0.16 0.2 0.28 0.32 0.48 0.72 1.04 1.86
5 0.04 0.07 0.1 0.15 0.2 0.25 0.35 0.4 0.6 0.9 1.3 2.33
6 0.04 0.08 0.12 0.17 0.23 0.3 0.42 0.48 0.72 1.08 1.56 2.79
7 0.05 0.09 0.14 0.2 0.27 0.35 0.49 0.56 0.84 1.26 1.82 3.26
8 0.06 0.1 0.16 0.23 0.32 0.4 0.56 0.64 0.06 1.44 2.38 3.72
9 0.07 0.12 0.18 0.26 0.36 0.45 0.63 0.72 1.08 1.62 2.34 4.19
10 0.07 0.13 0.20 0.29 0.4 0.5 0.7 0.8 1.2 1.8 2.6 4.65
12 0.09 0.16 0.24 0.35 0.48 0.6 0.84 0.96 1.44 2.16 3.12 5.58
14 0.10 0.18 0.28 0.41 0.56 0.7 0.98 1.12 1.68 2.52 3.64 6.51
16 0.12 0.21 0.32 0.46 1.64 0.8 1.12 1.28 1.92 2.88 4.16 7.44
18 0.13 0.23 0.36 0.52 0.72 0.9 1.26 1.44 2.16 3.24 4.68 8.37
20 0.15 0.26 0.4 0.58 0.8 1 1.4 1.6 2.4 3.6 5.2 9.3
22 0.16 0.29 0.44 0.64 0.88 1.1 1.54 1.76 2.64 3.96 5.72 10.23
24 0.18 0.31 0.48 0.7 0.96 1.2 1.68 1.92 2.88 4.32 6.24 11.16
26 0.19 0.34 0.52 0.75 1.04 1.3 1.82 2.08 3.12 4.68 6.76 12.09
28 0.20 0.36 0.56 0.81 1.12 1.4 1.96 2.24 3.36 5.04 7.28 13.02
30 0.22 0.39 0.6 0.87 1.2 1.5 2.1 2.4 3.6 5.4 7.8 13.95
32 0.23 0.42 0.64 0.93 1.28 1.6 2.24 2.56 3.84 5.76 8.32 14.88
34 0.25 0.44 0.68 0.99 1.36 1.7 2.38 2.72 4.08 6.12 8.84 15.81
36 0.26 0.47 0.72 1.04 1.44 1.8 2.52 2.88 4.32 6.48 9.36 16.74
40 0.29 0.52 0.8 1.16 1.6 2 2.8 3.2 4.8 7.2 10.4 18.6
Sonotubes: Cubic Yards

TOP

Type "S" Mortar Formula for Concrete Blocks
ASTM C 270-06 Proportioning: Mix Together: Field Proportioning:
1 part Portland Cement 1 part
1/4 to 1/2 part Type S Lime 1/2 part
2-1/4 to 3 times the volume
of combined cementitious material
(cement & lime)
Mason Sand 4-1/2 parts
1 Cubic Yard Mason Sand
6 bags Portland Cement (94 lb each)
3 bags Type S Lime (50 lb each)

will make enough mortar to lay 400 block (8 inch each).

TOP
Volume Calculator
UPM High Performance Cold Mix Estimating Table

UPM Cold Mix Estimating Table
Ton Inch Square Feet Square Yards
1 ton 1.0 inch by199.3922.15
1 ton 2.0 inches by99.6911.08
1 ton 3.0 inches by66.467.38
1 ton 4.0 inches by49.855.54
1 ton 5.0 inches by39.884.43
1 ton 6.0 inches by33.233.69
1 ton 7.0 inches by28.483.16
1 ton 8.0 inches by24.922.77
1 ton 9.0 inches by22.152.46
1 ton 10.0 inches by19.942.22
Formula: Compacted Inplace Measurements:
Square Feet X Depth = Cubic Feet
Cubic Feet / 27 = Cubic Yards
Cubic Yards X 3,250 Lbs = Total Lbs
Total Lbs / 2000 = Total Tons
1 Cubic Foot = 120.37 Lbs
1 Cubic Yard = 3,250 Lbs
1 Cubic Yard = 1.62 Tons
1 Ton = 16.62 Cubic Feet
1 Sq Ft Inch = 10.03 Lbs
1 Sq Yd Inch = 90.28 Lbs

TOP

Site Map  Legal Disclaimer   Top                                                      © 2014 MDU Resources Group, Inc.